advance building solutions

Bell Center

  • Versatility: arena and auditorium (4 possible configurations)
  • Robust and flexible systems
  • Museum, 5 restaurants, television control room
  • Building connected to metro lines and commuter train
  • Design in 7 months, construction in phases, tight budget and schedule

Location: avenue des Canadiens-de-Montreal, Montreal
Cost: $230M
Area: 15,622 m², 21,273 seats