advance building solutions

École Polytechnique | Lassonde Buildings

LEED® Gold
Energia Award
Leonard Award
Canadian Consulting Engineering Award

  • First sustainable educational institution in Quebec
  • Energy savings of 60% compared to the Model National Energy Code for Buildings
  • Heat recovery on the stack from the Polytechnique’s main pavilion
  • Washroom facilities use rain and drainage water
  • Green roof: 800 m²

Location: Université de Montréal campus
Cost: $104.9M
Area: 32,700 m², 8 floors