advance building solutions

UQÀM | Biology Building

LEED® Silver

  • Electrical systems
  • Laboratory and animal facility design: strict requirements
  • Assistance with LEED® certification and commissioning
  • Lighting energy consumption 28% lower than ASHRAE 90.1-1999 Standard

Location: Saint-Urbain Street, between Sherbrooke and President-Kennedy, Montreal
Cost: $94.8M
Area: 34,700 m², 11 floors including 2 basements