advance building solutions

780 Brewster

LEED® Silver
Energia Award

  • Old cookie factory converted into an office building
  • Solutions to mitigate the unadulterated envelope’s low thermal resistance
  • Heat pumps connected through a mixed water network
  • Reuse of the old heating coils under the windows
  • Soundproofing of mechanical rooms, one per floor

Location: South-West Borough of Montreal
Cost: $15M
Area: 12,533 m², 5 floors