advance building solutions

Sico | Distribution Center

LEED®

  • Warehouse, unloading dock (40 garage doors) and offices
  • Regular and high risk (alkyd paint) storage
  • Solar wall to heat supplied outside air
  • Radiant heating on ceiling near doors on the unloading dock
  • Seven air distribution systems with thermal wheel for heat recovery

Location: Saint-Hubert
Cost: $13.5M
Area: 19,665 m²