From Montreal to Shanghai
Our goal: your performance
Demonstrated performance
Press releases
Engineer a career
français
Putting efficiency on the line
advance building solutions
Sico | Distribution Center
LEED
®
Warehouse, unloading dock (40 garage doors) and offices
Regular and high risk (alkyd paint) storage
Solar wall to heat supplied outside air
Radiant heating on ceiling near doors on the unloading dock
Seven air distribution systems with thermal wheel for heat recovery
Location: Saint-Hubert
Cost: $13.5M
Area: 19,665 m²
Health
Science and technology
Education
Retail and office space
Culture, sports and tourism
Residential
Transportation, oil and industry
Overview
Montreal-Trudeau Airport
Société de transport de Montréal
Louis-H.-La Fontaine Tunnel
Sico | Distribution Center
Hewitt
Thermal Plant (Russia)