advance building solutions

Thermal Plant (Russia)

  • Turn-key project
  • 6 boilers, 12 MW each, supplying the city
  • Components manufactured and pre-assembled in Quebec
  • Heat recovery: energy savings

Location: Pangody, Siberia
Cost: $4.4M
Area: 760 m²